Was this page helpful?
Your rating will help us improve our website.
This audit checklist is for assessing Solar Installation work. It outlines Level 1 and Level 2 performance and compliance checks, including collector orientation, materials, temperature control, pipework, gas boosting, and safety requirements. The BPC uses this checklist to guide audits against relevant standards, verify compliance, and identify faults in solar water heating installations.
Print this page
Email this page
Share this page